September 24, 2014 Minutes

                    

                                       Lake Wenatchee Water District

                                               Commissioners Meeting

                                                     September 25, 2014

                                               at Station 9 Fire House

 

Commissioners Present: President-Bruce Harris, Secretary- Bonnie Klasell, Commissioner Landis Bohn

Staff Present: Operator Charlie Cruickshank

Professional: Karen Kornher, RH2; Marc Marquis, attorney for The District

Guests Present: Barb Harris

 

Commissioner Harris opened the meeting at 10:02 am and acknowledged a quorum existed

Commissioner Harris motioned to waive the reading of the minutes for September 11, 2014; Commissioner Klasell seconded, passed and signed.

Public Comments: There were no public comments

Project Updates

Construction updates from Karen Kornher

  • Updated schedule from Belsaas & Smith has been emailed to all commissioners this morning
  • The well pump will be installed tomorrow
  • Tank staining is scheduled for 10/12/14
  • Asphalt paving is slated for 10/8; patching for 10/29
  • Mountain Park well improvements being worked on this week
  • PRV station installed

It may be already suffering from articular pains if: It is 10 years old or older. http://frankkrauseautomotive.com/testimonial/love-my-jeep-grand-cherokee/ cialis canada no prescription Men who have had recent on line viagra heart or penile surgery are advised against these medicines. Patients with heart problems who take Kamagra may be a straightforward answer to the current erection cialis without prescription drawback. There on line viagra also comes a time in everyday life you need to make essential decisionsin life.
Brown Road System Connection

Much discussion as to whether or not Brown Road will use the new tank or continue to use their existing tank before their new mainline is installed. Karen Kornher will review the plans and email a response.

Property Owner issues – none at this time.

Updates on the 2014 DWSRF loan process

Commissioner Klasell reported application was submitted online on September 17th and she received confirmation from Sara Herrara at DOH that it was received. They won’t review any of the application until November 1. Also, Karen Klocke said she spoke with Mark Barnett at Dept of Commerce and he will structure the loan to be 21 years, instead of 20 so our first payment won’t be until October of 2016. Therefore there is no need to convert our LID into an ULID.

 

Other Project Issues

Lester Addition water rights transfer

Marc Marquis advised the commissioner’s that DOE transferred and approved 4.4 acre/ft of Lester Addition’s water right to the District. Mark Peterson confirmed that no transfer deed for this was prepared in July of 2012 when all associations transferred their assets/water rights. Marc Marquis has prepared a quit claim deed for transfer, and based on the MOU between Lester Addition and the District it is their intent for us to receive those water rights. Since Whispering Pines became responsible for providing them water when their system failed, the last president of WPWUA has authority to sign the transfer document. Once that document is signed and notarized, Marc Marquis will record the deed at the county.

John Steer meter location

Karen Kornher confirmed that all customers that have meters relocated will be getting new meters/vaults. John Steer is one such customer; he will only be assessed for the meter reading attachment as his current meter does not have one. There was much discussion on how the meters being moved in Whispering Pines could be moved instead of replaced, as all of those additional meters were not budgeted for. No decision was made.

Two track road easement

Commissioner Bohn is concerned the pipe was placed in the wrong location. He provided a copy of the current Brown Road well easement with a drawing of where he thinks the pipe is located. He and Charlie will walk the area to determine if it was placed as designed. Until we know for sure that the placement follows the design, we really can’t evaluate how many linear feet are on each parcel. Subject was tabled.

Brown Road easement (dirt road)

Much discussion as to whether or not this is private property or a public right of way. Karen Kornher said that the assessor shows it as a non-maintained county road, but will check with Fitzpatrick (our surveyor) to verify this is true.

Notification letter of new higher water pressure in system at start up

Commissioner Harris prepared a letter to be sent to all customers in Whispering Pines and Lester addition advising them that there will be pressure changes once we switch over to the new reservoir. Karen Kornher is going to modify the letter, and include a table with the changes to their pressure at the meter (either up or down) and will also provide a way to calculate the pressure at the homes, depending on location on their parcel.

Commissioner Klasell moved that this letter be sent after Commissioners review Karen Kornher’s modifications and additions, Commissioner Harris seconded. Motion passed.

Water line AAA insurance

A customer informed the commissioners of an insurance plan for sewer and service lines, he asked that we forward to all customers. The commissioner’s decided that it was not the District’s place to distribute the information as it could appear that we are endorsing it.

Other Issues

Brown Road valve leak

Charlie discovered a valve leak at the corner of Brown Road and Fir. We are losing approximately 1/2gal/minute. Commissioner Harris said this is a known leak, and asked Karen Kornher is that line was going to be replaced. She will get back to us with that information, repair decision tabled until we hear back from her.

Franz Meyer Connection – no contact from Mr. Meyer or his attorney. Until we know for sure he has an easement across private property, we can’t place a meter for him next summer. This led to discussion about 3 parcels in Lester Addition that are currently sharing one service line. Commissioner Klasell will compose a letter reminding those parcels that they will need to have an easement in place and also run independent services lines to the mainline on Fir Drive to be connected next summer.

Vance Lake parcel

The District received a call from a gentleman requesting if there is water available if this parcel is sub platted. Karen Kornher determined our maximum connections (ERU) are 218 so the clerk can advise him that as of this date we do have water available. However, that can change in the future if water usage changes or more parcels connect to the system.

Operations update from Charlie

Charlie noticed big chlorine swings in Whispering Pines, discovered another leak on Lester Addition. It is very significant water loss, and the leak is on a service line that is serving 3 separate parcels. The service line has been shut off at the mainline, and Commissioner Harris will compose a letter to send to those customers advising that water will not be turned back on until repairs are made.

Snowplow Bids

Commissioner Klasell reminded the commissioners that it is time to send out request for bids for snowplowing. It was determined that the only areas for plowing will be Mtn. Park pump house LW pump house and BR new combined facility. We will issue a 3 year contract. Commissioner Klasell will compose the letter and send it to qualified parties on our small works roster.

 

Commissioner Harris moved to adjourn the meeting at 12:20pm, Commissioner Bohn seconded, meeting adjourned.

The next meeting will be held October 9, 2014 at 10:00 am

 

 

September 11, 2014 Minutes

                    

                                       Lake Wenatchee Water District

                                               Commissioners Meeting

                                                      Sept 11, 2014

                                               at Station 9 Fire House

Commissioners Present: President-Bruce Harris, Secretary- Bonnie Klasell, Commissioner Landis Bohn

Staff Present: Clerk Elaine Kinney, Operator Charlie Cruickshank

Professional: Karen Kornher, RH2

Guests Present: Barb Harris

Commissioner Harris opened the meeting at 10:00 am and acknowledged a quorum existed.

Commissioner Harris motioned to waive the reading of the minutes for Aug. 28, 2014 and accept as written; Commissioner Klasell seconded, passed and signed.

Public Comments: There were no public comments

Project Updates

Updates on the 2014 DWSRF loan application for the 2015 funding:

Commissioner Klasell distributed the draft application. The Commissioners discussed the application and the budget presented by RH2. After Karen Kornher joined the meeting, she answered the Commissioners concerns.

Commissioner Harris motioned to authorize Commissioner Klasell to sign and submit the loan application only after revisions have been reviewed by Karen Klocke and Dan Bannier, Commissioner Bohn seconded, passed.

Construction startup status updates:

  • Charlie reported that the first section of the new water line passed the pressure test for leaks and the second section was having issues. As of today, they pressurized the second section and it has held pressure for 20 minutes before the meeting.
  • The Mount Baker Silo crew building the new reservoir is progressing very quickly and things are moving along. By next week it should be completed and will have to sit for 28 days before being utilized.

RH2 contract for the design work for Phase 2:

After discussion about the contract received which covers the whole Phase 2 process including the bidding, it was determined that the Commissioners would only approve, at this time, the design phase amount.

Commissioner Klasell motioned to sign the RH2 contract for the design portion of the contract only, for the amount of $15,208.00, Commissioner Bohn seconded, passed.

 

Other Project Issues

Two Track Issue: After some discussion, the subject was tabled until the next meeting when our attorney, Marc Marquis is present.

Brown Road Dirt Road Issue: Commissioner Harris is working with the PUD regarding their easement to use that road for power. It needs to be determined if the road is a county right of way or part of each parcel. All maps indicate that it is a road, thus a right of way. More needs to be done.

Administrative

Commissioner Klasell discussed the reconciled Treasurer’s Report for August 2014; as of 9/8/14 our funds are $51,985.65 at the County; Imprest balance is $461.94.

Commissioner Klasell moved to sign the O&M warrant in the amount of $2,823.77.  Motion seconded by Commissioner Bohn, motion passed. Imprest expenses for last month were $47.16 for postage and office supplies.

Commissioner Klasell motioned to sign the Payroll voucher for August in the amount of $1,286.50. Motion seconded by Commissioner Harris, motion passed.   

Commissioner Klasell discussed the DWSRF budget status as of 8/31/14 and the remaining budget for Phase 1. We have spent $1,068,525.46 and have $1,092,288.45 remaining in the loan after A19 #32 is processed.

Commissioner Klasell moved to sign A19 #32 and supporting CPF warrant for $166,326.09. This included Pay Request #3 from Belsaas & Smith in the amount of $148,666.41. Commissioner Bohn seconded, motion passed.

Other Issues

McCord Connection: Mr. McCord has decided to wait until spring 2015

Frank Mayer: No further correspondence has been received.

Feedback from Werth, Dickinson, and Paris parcel regarding the LID opt out: At this time we have received Diane Dickinson’s opt out, only. We have not heard from Werth or Paris.

Donaldson’s request for water availability for 8 acre plot in WP: Karen Kornher assist in contacting planning department to determine if water availability is required to subdivide land. She will also calculate our current ERUs (Equivalent Residential Usage) from our source meter data, and determine maximum water system capacity (ERUs) for the entire district. After this has been determined, Mr. Donaldson will be contacted.

Operations Update: Charlie pointed out that we need a locator device for the District. RH2 will put that as part of the final bid item.

Commissioner Harris motioned to adjourn the meeting at 11:45 am, Commissioner Bohn seconded, meeting adjourned.

The next meeting will be held on September 25, 2014 at 10:00 am at the District 9 Fire Station.

 

But it is often tough to recognize our own viagra no prescription cheap behavior. It cannot http://frankkrauseautomotive.com/testimonial/used-car-purchase/ online cialis be used to increase the sex drive. A lot of enhancers in the market like frankkrauseautomotive.com buy generic levitra. Any person frankkrauseautomotive.com viagra price suffering from ED issues end up suffering from reduced case of blood circulation during the period of active sexual pleasure.